Project Overview

In support of the 1st & Main Transit Station, a new connection of Coffman Street from 1st Avenue to Boston Avenue will be constructed. This extension of Coffman Street will include significant pedestrian and multimodal improvements similar to those that were recently constructed on Coffman Street from 2nd Avenue to 9th Avenue. Improvements related to the Coffman Street Extension will extend beyond just the extension of Coffman Street and include improvements north to 2nd Avenue and south to the St. Vrain Greenway.

 

This project is peripherally mentioned in the Longmont Transportation Mobility Plan.

 

Goals & Planned Improvements

This project will serve as the primary point of access to the future 1st & Main Station parking garage and RTD transit hub. It will support efficient pedestrian, bicycle and vehicle access to Bus Rapid Transit (BRT) services that are scheduled to begin in early 2028. Additionally, this project intends to service as a direct connection between the St. Vrain Greenway and downtown Longmont by connecting to the recently completed Coffman Street Mobility Improvements north of 2nd Avenue.

 

Project Schedule

Finalized Design – June 2026

Construction Start – September 2026

Anticipated Construction Period – 9 Months

 

Public Notification

This project was featured at the Connect Longmont event on April 22, 2026.

Project Map
Map with Main St at the bottom with a navy rectangle labeled "Mixed-use Development" with an orange box above labeled "1st & Main Station Parking Structure." The rectangles are between Main  St and Coffman St between 1st Ave and Boston Ave. The map also shows a Detention pond to the south of Boston Ave.
Funding

Estimated cost: $7.6MM
Paid for by a combination of funds from:

    • TCIF
    • Storm Drain
    • Sewer
    • Water

Storm Debris Update: Limb and Branch Collection